Sec. 6-79. Schedule Of Fees, Charges And Rates:

Description Amount Section
Of Code
Board of building appeals fee $175.00 2-140
Construction permit fee for new single-family and two-family residential construction, per square foot area: Brick/ Brick/ Frame
Veneer Masonry
     Basement
     Crawlspace
     First floor
     Second floor
     Third floor
     Garage attached
     Garage detached
     Porch open
     Porch enclosed
$0.080 $0.16 $0.16
0.044 0.080 0.080
0.322 0.402 0.482
0.242 0.322 0.322
0.242 0.322 0.322
0.080 0.160 0.242
0.160 0.242 0.322
0.242 0.278 0.278
0.284 0.322 0.322
6-6
Construction permit fee for all types of construction other than new single-family and two-family residential construction Based on estimated cost of construction, $23.00 per $1,000.00 for the first $10,000.00 of estimated cost, and $17.20 per $1,000.00 for each $1,000.00 of estimated construction cost, or fraction thereof, thereafter 6-6
Passenger, freight, hand elevators, power operated dumbwaiters, moving stairways or similar hoisting devices:
     Initial certification $30.00 6-6
     Temporary use permit 30.00 6-6
     Semiannual inspection, testing and certification 30.00 6-6
Heating permit for new single-family and two-family residential construction $40.00 per 1,000 square feet of living space 6-6
Inspection/reinspection fee $50.00 6-6
Certificate of occupancy/ compliance inspection 50.00 6-6
Residential construction plan review fees1, based on estimated cost of construction: 6-6
     Up to $5,000.00 20.00
     $5,001.00 to $15,000.00 50.00
     $15,001.00 to $50,000.00 100.00
     In excess of $50,000.00 150.00
Commercial construction plan review fees1 based on estimated cost of construction: 6-6
     Up to $50,000.00 100.00
     $50,001.00 to $100,000.00 200.00
     $100,001.00 to
     $500,000.00
400.00
     In excess of $500,000.00 600.00
Extension of building permit based on estimated construction cost per month of extension 0.50 per $1.000.00 6-19(d)
Permit to remove building or structure to a different lot based on the estimated value of the building or structure in its completed condition after removal to a new lot 1.00 per $1,000.00 6-32
Relocation of a building or structure to a new location within the same lot based on the estimated cost of moving, including new foundations work necessary to put the building or structure in a usable condition in its new location 4.00 per $1,000.00 6-32
Fee for demolition of a building or structure $100.00 for each 1,000 square feet or fraction of the gross area of the lot upon which the building or structure is located 6-33
Swimming pool permit fees based on estimated cost of the erection or construction of the swimming pool $23.00 per $1,000.00 of the first $10,000.00
$17.20 per $1,000.00 for each $1,000.00, or fraction thereof
6-51
Electrical permits2: 8-4
     Base electrical permit fee (Each device used in an opening such as a switch, receptacle, light fixture, motors of less than 1/2 hp and heating or other units of less than 600 watts is considered an outlet) $25.00 plus $1.00 for each electric device opening
     Fixture installations $1.00 per fixture
     Motor installations Base charge $12.50 plus $0.50 per hp (motors of 1/2 hp and larger only)
     Heating and other installations (Heating and other units of 600 watts and larger only) kVA fee = $1.00
     Swimming pool installations Base charge $25.00 plus $0.50 per opening and $0.50 per fixture
     Sign installations (overall dimensions of sign illumination) $ 4.00 per square foot
     New service/upgrade 75.00
Sewer tapping/inspection fee: 16-5
     Licensed plumbing inspector (independent contractor) Consultant fee plus 15 percent
     Single-family/sanitary connection and inspection $300.00 connection
50.00 inspection
     Single-family/storm connection and inspection 200.00 connection
50.00 inspection
     Commercial zoned property/sanita
ry connection and inspection
1,000.00 per acre connection fee
200.00 inspection fee
     Commercial zoned property/storm connection and inspection 400.00 per acre connection fee
200.00 inspection fee
     Industrial, office and research zoned property/sanita
ry connection
1,200.00 per acre connection fee
     Industrial, office and research zoned property/storm connection 400.00 per acre connection fee
     Special use zoned property sanitary connection 1,200.00 per acre connection fee
     Special use zoned property storm connection 400.00 per acre connection fee
     Multi-family zoned property/sanitary connection and inspection 80.00 per unit connection fee
20.00 per unit inspection fee
50.00 minimum
     Multi-family zoned property/storm connection and inspection 60.00 per unit connection fee
20.00 per unit inspection fee
50.00 minimum
Residential driveway permit 50.00 19-24(d)
100.00 deposit for each 10 feet in driveway width, or fraction thereof
Commercial driveway permit 50.00 19-24(c)
Parkway and street excavation permits 30.00 19-31(a)
Parkway excavation deposit 500.00 19-31(b)
Opening a public street or alley and/or excavation or tunneling deposit 1,000.00 19-31(c)
$1,000.00 deposit plus $30.00 per square foot of openings that are in excess of 4 feet by 4 feet
Fence permit $50.00 19-62
Tree preservation plan review: 21-29(c)
     Demolition with no building permit 275.00
     Lot improvement (no demolition):
     Decks and patios 140.00
     Driveways 150.00
     Fences, sheds and accessory structures 125.00
     Irrigation systems 125.00
     Pools and tennis courts 195.00
     Room additions 275.00
     Lot redevelopment, with demolition 525.00
     Lot redevelopment, without demolition 450.00
Ad hoc tree removal:
     Permit application 75.00 21-31(c)
     Permit 125.00
     Permit for dead, hazardous and nuisance trees 0.00
Cash tree replacement fee 125.00 per caliper inch 21-34
Water permit, meter and connection fees:
     Meter Cost of meter (FOB) plus 15 percent 23-5
     Roundway Cost of roundway (FOB) plus 15 percent
     "B" box Cost of "B" box (FOB) plus 15 percent
     Corporation Cost of corporation (FOB) plus 15 percent
     Fittings Cost of fittings (FOB) plus 15 percent
     1 inch tap, 3/4 inch meter $125.00 tap fee
80.00 future repair
80.00 inspection
     1 inch tap, 3/4 inch ROM 125.00 tap fee
80.00 future repair
80.00 inspection
     1 inch tap, 1 inch meter 125.00 tap fee
80.00 future repair
80.00 inspection
     1 inch tap, 1 inch ROM 125.00 tap fee
80.00 future repair
80.00 inspection
     Larger than 1 inch tap 125.00 tap fee
150.00 future repair
15.00 inspection
     Commercial tap fee 200.00 per acre (or fraction), plus
400.00 per inch of tap
23-7(a)(1)
     Industrial tap fee 300.00 per acre (or fraction), plus
400.00 per inch of tap
23-7(a)(2)
Air condition system permit:
     Permit to install new 1.00 per ton of refrigerant, plus 20.00 23-26(a)
     Permit to alter/modify 1.00 per ton of refrigerant, plus 20.00 23-26(b)

Notes:

1. Any plan review requiring use by the village of an outside agency shall be based upon cost plus handling charges. All plan review fees must be paid at the time of application for any permit that requires municipal code compliance review. Plan review fees are nonrefundable.

2. a. The permit issued on this application will authorize only work here applied for. If other work is done, it must be covered by additional permits.

b. Fees to be charged for electrical installations other than as indicated in the above schedule shall be determined by the department on the basis of estimated inspection costs.

c. The fee for reinspection of electrical installations and equipment or extra inspections due to inaccurate or incorrect information or failure to make necessary repairs of faulty construction shall be $25.00.

(Ord. 0-94-29, 7-18-1994; amd. Ord. 0-04-29, 5-17-2004; Ord. 0-04-49, 9-20-2004; Ord. 0-05-9, 3-21-2005)